Pulsafeeder 03-180-36 PVC Schedule 80 Pipe 1/2 x 2 Inch
Pulsafeeder 03-180-36 is a 1/2-inch x 2-inch PVC Schedule 80 pipe component for compatible chemical metering pump piping assemblies and maintenance applications.
The Pulsafeeder 03-180-36 is a PVC Schedule 80 pipe component measuring 1/2 inch x 2 inches. This replacement piping component is identified in Pulsafeeder parts listings for industrial pump and fluid-handling applications.
Manufactured from PVC, the 03-180-36 pipe component provides a compact piping section for compatible equipment assemblies. Schedule 80 PVC features a thicker wall than comparable Schedule 40 PVC pipe of the same nominal size, making it suitable for appropriately rated piping applications.
Product Specifications
- Manufacturer: Pulsafeeder
- Part Number: 03-180-36
- Product Type: Pipe Component
- Material: PVC
- Pipe Schedule: Schedule 80
- Nominal Pipe Size: 1/2 inch
- Length: 2 inches
- Application: Compatible pump piping and fluid-handling assemblies
PVC Schedule 80 Construction
The Pulsafeeder 03-180-36 uses Schedule 80 PVC construction. PVC is commonly selected for fluid-handling systems because of its corrosion resistance and compatibility with various chemicals under appropriate operating conditions.
Schedule 80 construction provides a thicker pipe wall than Schedule 40 of the same nominal size. Actual pressure and temperature suitability depend on the piping configuration, applicable ratings and installation conditions.
Chemical Metering Pump Applications
The 03-180-36 PVC pipe may be used as a replacement piping section in compatible Pulsafeeder chemical metering pump installations and associated fluid-handling assemblies.
Replacing worn, damaged or chemically degraded piping components can help maintain the integrity of a properly designed fluid-transfer system.
Replacement and Installation
Before ordering the Pulsafeeder 03-180-36, confirm the original part number, nominal pipe size, required length, connection configuration and compatibility with the process fluid.
Always follow the equipment manufacturer recommendations and applicable piping installation requirements.
| Type | Accessories |
|---|